You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Air Jalan Bantar Jati Setu Rampung

Channel Normalization on Jalan Bantar Jati Completed

Recently, water channel as long as 500 meters on Jalan Bantar Jati, RW 02, Setu Urban Village, Cipayung, East Jakarta has been normalized. This normalization is done by Cipayung Water Resources (SDA) Unit together with PPSU personnel and local residents.

We want to anticipate flood by normalizing this channel

According to Setu Urban Village Head, Jenuri, normalization is done because channel had been silted up due to mud sedimentation and there are some damaged parts of this channel.

"We want to anticipate flood by normalizing this channel," he said, Friday (5/10).

Manhole Cover on Jalan HR Rasuna Said Repaired

Normalization is done by personnel and residents using hoes, crowbars and others for about a week. Some of local residents also contribute by giving materials to repair channel such as cement, stones, and sand.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2630 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2312 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye972 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye834 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye733 personBudhi Firmansyah Surapati